000 01662nam  2200313za 4500
0019.845219
003CaOODSP
00520221107152921
007cr |||||||||||
008171006s1980    onc    |o    f|0| 0 eng d
040 |aCaOODSP|beng
043 |an-cn---
0861 |aCS12-564/1980E-PDF
1001 |aDagum, Estela Bee.
24514|aThe X-II-ARIMA seasonal adjustment method |h[electronic resource] / |cby Estela Bee Dagum.
260 |aOttawa : |bStatistics Canada, |c1980.
300 |a119 p.
500 |aIssued also in French under the title: La méthode de désaisonnalisation X-II-ARMMI.
500 |aDigitized edition from print [produced by Statistics Canada].
500 |a"February 1980."
504 |aIncludes bibliographical references.
520 |a"The X-II-ARIMA method was officially adopted by Statistics Canada in January 1975 for the seasonal adjustment of the main Labour Force series and other economic indicators. The procedure was then applied by separately running two different computer programs: first, the ARIMA program which generated the projected values from a model already identified by the user; and second, the X-II which produced the seasonally adjusted series from the original unadjusted series extended by one or two years of extrapolated values."--Preface.
69207|2gccst|aSeasonal employment
69207|2gccst|aSurveys
69207|2gccst|aStatistics
7102 |aStatistics Canada.
77508|tLa méthode de désaisonnalisation X-II-ARMMI |w(CaOODSP)9.845251
85640|qPDF|s19.05 MB|uhttps://publications.gc.ca/collections/collection_2017/statcan/CS12-564-1980-eng.pdf