Environment Canada review of the Keenleyside - Murphy hydroelectric projects : detailed environmental studies. : En39-33/1983E-PDF
"As a result of the Task Force review, Environment Canada has no significant environmental concerns to raise regarding the Keenleyside Powerplant and Keenleyside-Murphy Creek Transmission Projects. ... Because the planned Keenleside-Murphy hydroelectric projects are likely to result in changes in total dissolved gas concentrations and in their downstream distribution in the lower reaches of the Columbia River, it is recommended that a detailed study of gas supersaturation be carried out. The study area should include the Columbia River between the Hugh Keenleyside Dam and the International Bounday"--p. [20].
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.845800&sl=1
Ministère/Organisme | Canada. Environment Canada. |
---|---|
Titre | Environment Canada review of the Keenleyside - Murphy hydroelectric projects : detailed environmental studies. |
Type de publication | Monographie |
Langue | [Anglais] |
Format | Électronique |
Document électronique | |
Note(s) | Digitized edition from print [produced by Environment and Climate Change Canada]. Includes bibliographical references. Environment Canada review of the Murphy Creek hydroelectric project: detailed environmental studies -- Environment Canada review of the Keenleyside powerplant and Keenleyside - Murphy Creek transmission projects: detailed environmental studies. |
Information sur la publication | Vancouver, B.C. : Environment Canada,[1983]. |
Description | 18, [6 ] p. |
Numéro de catalogue |
|
Descripteurs | Hydroelectric plants Environmental impact assessment |