000 01609nam  2200277za 4500
0019.850556
003CaOODSP
00520221107154159
007cr |||||||||||
008180123s1989    quca||||o    f000 0 eng d
040 |aCaOODSP|beng
043 |an-cn---
0861 |aEn107-3/89-1989E-PDF
1001 |aMissler, Heidi Erika.
24514|aThe role of EIA in the hydroelectric planning process |h[electronic resource] / |cHeidi E. Missler.
260 |a[Hull, Quebec] : |bCanadian Environmental Assessment Research Council, |c1989.
300 |av, 88 p. : |bill.
500 |aCover title.
500 |aDigitized edition from print [produced by Canadian Environmental Assessment Agency].
504 |aIncludes bibliographic references.
520 |a"Procedures for the selection, licensing and implementation of large scale energy projects must evolve with the escalating complexity of such projects and the changing public value system. Despite the introduction of cost-benefit analysis in the early 1960s (Sewell et al., 1962), followed by environmental and social impact assessment procedures in the late 1960s and early 197Os, respectively, government policies appeared unresponsive to the rapidly changing conditions. ..."--Introd., p. [1].
69207|2gccst|aEnvironmental impact assessment
69207|2gccst|aHydropower
7101 |aCanada. |bCanadian Environmental Assessment Agency.
7760#|tThe role of EIA in the hydroelectric planning process / |w(CaOODSP)9.645413
85640|qPDF|s1.56 MB|uhttps://publications.gc.ca/collections/collection_2018/acee-ceaa/En107-3-89-1989-eng.pdf