| 000 | 00000nam 2200000za 4500 |
| 001 | 9.855365 |
| 003 | CaOODSP |
| 005 | 20221107155302 |
| 007 | cr ||||||||||| |
| 008 | 180417s2018 oncbdo #ob f000 0 eng d |
| 020 | |a978-0-660-26280-2 |
| 040 | |aCaOODSP|beng |
| 043 | |an-cn--- |
| 086 | 1 |aFA1-27/2018-1-2E-PDF |
| 110 | 1 |aCanada. |bOffice of the Auditor General. |
| 245 | 10|aReplacing Montreal’s Champlain Bridge |h[electronic resource] : |bInfrastructure Canada : independent auditor’s report. |
| 260 | |a[Ottawa] : |bOffice of the Auditor General of Canada, |cc2018. |
| 300 | |aiii, 28 p. : |bmaps, graphs, photographs |
| 490 | 1 |aReports of the Auditor General of Canada to the Parliament of Canada, |x2561-343X ; |vSpring 2018, report 4 |
| 500 | |aIssued also in French under title: Le remplacement du pont Champlain de Montréal : Infrastructure Canada : rapport de l’auditeur indépendant. |
| 504 | |aIncludes bibliographical references. |
| 520 | |a"The objective of this audit was to determine whether Infrastructure Canada managed selected aspects of the new Champlain Bridge project to meet the objective of delivering a durable bridge on time and in a cost-effective manner"--Audit objective, p. 24. |
| 530 | |aIssued also in print format. |
| 692 | 07|2gccst|aAudit |
| 692 | 07|2gccst|aBridges |
| 692 | 07|2gccst|aInfrastructures |
| 775 | 08|tLe remplacement du pont Champlain de Montréal |w(CaOODSP)9.855419 |
| 776 | 0#|tReplacing Montreal’s Champlain Bridge |w(CaOODSP)9.855464 |
| 830 | #0|aReports of the Auditor General of Canada to the Parliament of Canada,|x2561-343X ; |vSpring 2018, report 4.|w(CaOODSP)9.846691 |
| 856 | 40|qPDF|s843 Ko|uhttps://publications.gc.ca/collections/collection_2018/bvg-oag/FA1-27-2018-1-2-eng.pdf |