Third-party damage to a crude oil pipeline, Enbridge Pipelines Inc., line 2, Sherwood Park, Alberta, 17 February 2017 . : TU3-8/17-0011E-PDF
"On 17 February 2017, at approximately 1505 Mountain Standard Time, a 610 mm (24-inch) pipeline operated by Enbridge Pipelines Inc. was struck and punctured by a 28-inch reamer during the installation of a Grand Rapids Pipeline GP Ltd. pipeline. Approximately 1000 m3 of petroleum crude oil condensate was released into an excavation in the vicinity of the occurrence, saturating the soil. Most of the released product was recovered. There were no injuries, and no off-site evacuation was required"--Summary.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.858716&sl=1
Ministère/Organisme | Transportation Safety Board of Canada. |
---|---|
Titre | Third-party damage to a crude oil pipeline, Enbridge Pipelines Inc., line 2, Sherwood Park, Alberta, 17 February 2017 . |
Titre de la série | Pipeline investigation report ; P17H0011 |
Type de publication | Série - Voir l'enregistrement principal |
Langue | [Anglais] |
Autres langues publiées | [Français] |
Format | Électronique |
Document électronique | |
Note(s) | Title from caption. Issued also in French under title: Dommages causés par des tiers à un pipeline de pétrole brut, Enbridge Pipelines Inc., canalisation 2, Sherwood Park (Alberta), 17 février 2017. Includes bibliographical references. |
Information sur la publication | Gatineau, QC : Transportation Safety Board of Canada, c2018. |
Description | iv, 39 p. : maps, photographs |
ISBN | 978-0-660-27177-4 |
Numéro de catalogue |
|
Descripteurs | Pipelines Accidents Investigations |