Third-party damage to a crude oil pipeline, Enbridge Pipelines Inc., line 2, Sherwood Park, Alberta, 17 February 2017 . : TU3-8/17-0011E-PDF

"On 17 February 2017, at approximately 1505 Mountain Standard Time, a 610 mm (24-inch) pipeline operated by Enbridge Pipelines Inc. was struck and punctured by a 28-inch reamer during the installation of a Grand Rapids Pipeline GP Ltd. pipeline. Approximately 1000 m3 of petroleum crude oil condensate was released into an excavation in the vicinity of the occurrence, saturating the soil. Most of the released product was recovered. There were no injuries, and no off-site evacuation was required"--Summary.

Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.858716&sl=1

Renseignements sur la publication
Ministère/Organisme Transportation Safety Board of Canada.
Titre Third-party damage to a crude oil pipeline, Enbridge Pipelines Inc., line 2, Sherwood Park, Alberta, 17 February 2017 .
Titre de la série Pipeline investigation report ; P17H0011
Type de publication Série - Voir l'enregistrement principal
Langue [Anglais]
Autres langues publiées [Français]
Format Électronique
Document électronique
Note(s) Title from caption.
Issued also in French under title: Dommages causés par des tiers à un pipeline de pétrole brut, Enbridge Pipelines Inc., canalisation 2, Sherwood Park (Alberta), 17 février 2017.
Includes bibliographical references.
Information sur la publication Gatineau, QC : Transportation Safety Board of Canada, c2018.
Description iv, 39 p. : maps, photographs
ISBN 978-0-660-27177-4
Numéro de catalogue
  • TU3-8/17-0011E-PDF
Descripteurs Pipelines
Accidents
Investigations
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.
Date de modification :