Third-party damage to a crude oil pipeline, Enbridge Pipelines Inc., line 2, Sherwood Park, Alberta, 17 February 2017 . : TU3-8/17-0011E-PDF
"On 17 February 2017, at approximately 1505 Mountain Standard Time, a 610 mm (24-inch) pipeline operated by Enbridge Pipelines Inc. was struck and punctured by a 28-inch reamer during the installation of a Grand Rapids Pipeline GP Ltd. pipeline. Approximately 1000 m3 of petroleum crude oil condensate was released into an excavation in the vicinity of the occurrence, saturating the soil. Most of the released product was recovered. There were no injuries, and no off-site evacuation was required"--Summary.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.858716&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Third-party damage to a crude oil pipeline, Enbridge Pipelines Inc., line 2, Sherwood Park, Alberta, 17 February 2017 . |
| Titre de la série |
|
| Type de publication | Monographie - Voir l'enregistrement principal |
| Langue | [Anglais] |
| Autres langues publiées | [Français] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Description | iv, 39 p. : maps, photographs |
| ISBN | 978-0-660-27177-4 |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :