000 02143nam  2200397zi 4500
0019.869220
003CaOODSP
00520221107162811
006m     o  d f      
007cr cn|||||||||
008190304t20192019abca    o    f000 0 eng d
020 |a9780660298672
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn---
0861 |aNE23-201/2019E-PDF
24500|aOptimizing oil pipeline and rail capacity out of Western Canada : |badvice to the Minister of Natural Resources.
264 1|a[Calgary] : |bNational Energy Board = Office national de l'énergie, |c2019.
264 4|c©2019
300 |a1 online resource (23 pages) : |bcolour illustrations
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aIssued also in French under title: Optimisation des capacités pipelinière et ferroviaire pour le transport de pétrole hors de l'Ouest canadien : avis au ministre des Ressources naturelles.
500 |aCover title.
500 |a"March 2019."
500 |aIssued also in HTML format.
520 |a"This National Energy Board (NEB) report examines short and long-term options to optimize oil pipeline capacity out of Western Canada as requested by the Minister of Natural Resources. The report states that any notable increase in pipeline or rail capacity would need to come from new major infrastructure projects as current pipeline capacity is fully utilized and rail infrastructure is operating at or near capacity"--Provided by publisher.
69207|2gccst|aPetroleum
69207|2gccst|aPipelines
69207|2gccst|aRail transport
69207|2gccst|aGovernment policy
7101 |aCanada. |bNational Energy Board.
77508|tOptimisation des capacités pipelinière et ferroviaire pour le transport de pétrole hors de l'Ouest canadien : |w(CaOODSP)9.869222
85640|qPDF|s5.54 MB|uhttps://publications.gc.ca/collections/collection_2019/one-neb/NE23-201-2019-eng.pdf
8564 |qHTML|sN/A|uhttps://www.neb-one.gc.ca/nrg/sttstc/crdlndptrlmprdct/rprt/2019ptmzngcpct/index-eng.html