000
| 01943cam 2200349zi 4500 |
---|
001 | 9.873696 |
---|
003 | CaOODSP |
---|
005 | 20221107164003 |
---|
006 | m o d f |
---|
007 | cr |n||||||||| |
---|
008 | 190528e198107##oncad |ot f00| 0 eng d |
---|
040 | |aCaOODSP|beng|erda|cCaOODSP |
---|
043 | |an-cn-on |
---|
086 | 1 |aEn13-6/81-20E-PDF |
---|
100 | 1 |aZeman, Ales Jan, |eauthor. |
---|
245 | 10|aCalculation of bearing capacity for proposed installation of vertical automatic profiler in Hamilton Harbour basin / |cauthor, A.J. Zeman, Shore Processes Section. |
---|
264 | 1|a[Burlington, Ont.] : |bHydraulics Division, [National Water Research Institute], |cJuly 1981. |
---|
300 | |a1 online resource (31 pages) : |billustrations, charts. |
---|
336 | |atext|btxt|2rdacontent |
---|
337 | |acomputer|bc|2rdamedia |
---|
338 | |aonline resource|bcr|2rdacarrier |
---|
490 | 1 |aTechnical note ; |vno. 81-20 |
---|
500 | |aDigitized edition from print [produced by Environment and Climate Change Canada]. |
---|
504 | |aIncludes bibliographical references. |
---|
520 | |a"On May 8, 1981, a request was received from Mr. F. E. Roy, Mechanical Engineering Unit, Hydraulics Division, to carry out geotechnical investigation of three sites in the Hamilton Harbour basin in connection with a proposed installation of an NWRI vertical automatic profiler GVAPS ES 1-32. Three Benthos core samples were obtained from locations shown in Figure 1 and they were received in the laboratory on May 15, 1981"--Introd. |
---|
653 | 0|aDrill core analysis |
---|
692 | 07|2gccst|aGeology |
---|
710 | 1 |aCanada. |bEnvironment Canada. |
---|
710 | 2 |aNational Water Research Institute (Canada). |bHydraulics Division. |
---|
830 | #0|aTechnical note (National Water Research Institute (Canada). Hydraulics Division)|vno. 81-20|w(CaOODSP)9.855127 |
---|
856 | 40|qPDF|s3.22 MB|uhttps://publications.gc.ca/collections/collection_2019/eccc/en13-6/En13-6-81-20-eng.pdf |
---|