000 01879cam  2200373zi 4500
0019.875199
003CaOODSP
00520221107164407
006m     o  d f      
007cr |n|||||||||
008190619e197812##oncad  |ot   f00| 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-on
0861 |aEn13-7/78-17E-PDF
1001 |aZeman, Ales Jan, |eauthor.
24510|aCalculation of bearing capacity and settlement for proposed installation of vertical automatic profiler in central Lake Erie basin / |cauthor: A.J. Zeman, Shore Processes Section.
264 1|a[Burlington, Ont.] : |bHydraulics Research Division, [National Water Research Division], |cDecember 1978.
300 |a1 online resource (10 pages, 7 unnumbered pages) : |billustrations, charts.
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
4901 |aTechnical note ; |vno. 78-17
500 |aDigitized edition from print [produced by Environment and Climate Change Canada].
500 |aTitle from cover.
504 |aIncludes bibliographical references.
520 |a"The configuration of an NWRI vertical automatic profiler is shown in Figure 1. The proposed installation site is not yet fixed, but it will be located approximately 81°15’ W, 42°15‘ N in the central Lake Erie basin"--Introduction, page 1.
653 0|aDrill core analysis
69207|2gccst|aGeology
69207|2gccst|aLakes
7101 |aCanada. |bEnvironment Canada.
7102 |aNational Water Research Institute (Canada). |bHydraulics Research Division.
830#0|aTechnical note (National Water Research Institute (Canada). Hydraulics Research Division)|vno. 78-17.|w(CaOODSP)9.865405
85640|qPDF|s1.44 MB|uhttps://publications.gc.ca/collections/collection_2019/eccc/En13-7-78-17-eng.pdf