000 02163nam  2200409zi 4500
0019.875972
003CaOODSP
00520221107164604
006m     o  d f      
007cr |||||||||||
008190708t20172017onca    ob   f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
041 |aeng|bfre
043 |an-cn---
0861 |aD68-9/087-2017E-PDF
1001 |aDixson, M., |eauthor.
24510|aStrategic planning operational research team reviews of high level mandatory requirements from 2014-2017 : |bissues and observations / |cM. Dixson, P.L. Massel, DRDC - Centre for Operational Research and Analysis.
264 1|a[Ottawa] : |bDefence Research and Development Canada, |c2017.
264 4|c©2017
300 |a1 online resource (vi, 23 pages, 2 unnumbered pages) : |billustrations.
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
4901 |aReference document ; |vDRDC-RDDC-2017-D087
500 |aTitle from cover.
500 |a"October 2017."
500 |a"Can unclassified."
504 |aIncludes bibliographical references (page 16).
5203 |a"For several years, defence scientists have provided informal, independent assessments of the Business Need (BN) statements and high level mandatory requirements (HLMR) as a necessary part of DND’s approval process for significant projects. This report provides an overview of the Departmental guidance governing the review process, the methods employed by the scientists to carry out the reviews and observations resulting from reviews conducted over the period from October 2014 to April 2017"--Abstract, page i.
546 |aIncludes abstract in French.
69207|2gccst|aStrategic management
69207|2gccst|aOperations
69207|2gccst|aReview
7001 |aMassel, P. L., |eauthor.
7102 |aDefence R&D Canada. |bCentre for Operational Research and Analysis.
830#0|aReference document (Defence R&D Canada)|vDRDC-RDDC-2017-D087.|w(CaOODSP)9.833971
85640|qPDF|s767 KB|uhttps://publications.gc.ca/collections/collection_2019/rddc-drdc/D68-9-087-2017-eng.pdf