000 01748cam  2200289zi 4500
0019.879331
003CaOODSP
00520221107165501
006m     o  d f      
007cr |n|||||||||
008190916e197507##onca||| o    f000 0|eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn---
0861 |aCo24-198/1975E-PDF
24500|aUHF communications payload implementation study : |bfinal report / |cRCA.
264 1|a[Ottawa] : |b[Communications Canada], |cJuly 1975.
300 |a(1 volume (various pagings)) : |bfigures.
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aDigitized edition from print [produced by Innovation, Science and Economic Development Canada].
520 |a"A related feasibility study on the multipurpose spacecraft, carried out under contract number P136100-4-0947, resulted in a report entitled "Communications Subsystem Feasibility Study". The implementation study of which this is the final report, carried on at the point where the feasibility study left off. That is, problems of availability of space qualified hardware, and various interfacing problems were investigated. The following paragraphs outline the payload concept developed in the feasibility study. For a more detailed description of the concepts and operation of the communications payload, the reader is referred to the final report on the feasibility study referenced above"--Summary, page 1.
69207|2gccst|aSatellites
7101 |aCanada. |bDepartment of Communications.
7102 |aRCA Limited.
85640|qPDF|s6.46 MB|uhttps://publications.gc.ca/collections/collection_2019/isde-ised/Co24/Co24-198-1975-eng.pdf