Benefit-cost analysis improved flood forecasting system : 1. Boyne River Pilot Project ; 2. Red, Assiniboine and Souris Rivers under the Canada-Manitoba agreement respecting flood forecasting / prepared... : En37-215/1980E-PDF
""An Agreement Respecting Flood Forecasting" is being negotiated between Canada and Manitoba, in general support of the Canada-Manitoba Flood Damage Reduction Program started in 1978. The following benefit-cost analysis is intended to determine the economic feasibility of the two projects proposed under the agreement: the Boyne River Pilot Project, and improvements to the flood forecasting system for the Red, Assiniboine and Souris Rivers"--Introduction, page 1.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.895269&sl=1
Ministère/Organisme | Canada. Inland Waters Directorate. Water Planning and Management Branch, issuing body. Canada. Environment Canada, issuing body. |
---|---|
Titre | Benefit-cost analysis improved flood forecasting system : 1. Boyne River Pilot Project ; 2. Red, Assiniboine and Souris Rivers under the Canada-Manitoba agreement respecting flood forecasting / prepared by Hans Foerstel, Hasu Naik. |
Type de publication | Monographie |
Langue | [Anglais] |
Format | Électronique |
Document électronique | |
Note(s) | Digitized edition from print [produced by Environment and Climate Change Canada]. "February 1980." Includes bibliographical references (pages 20-22). |
Information sur la publication | Regina, Saskatchewan : Environment Canada, Western and Northern Region, Inland Waters Directorate, Water Planning and Management Branch, 1980. |
Auteur / Contributeur | Foerstel, Hans,1935- author. |
Description | 1 online resource (iv, 37 pages) : charts, map |
Numéro de catalogue |
|
Descripteurs | Flood forecasting -- Manitoba -- Cost effectiveness. Inondations -- Prévision -- Manitoba -- Coût-efficacité. |