Testing of fresh air mixing devices / prepared for: Research Division, Canada Mortgage and Housing Corporation; prepared by: IRTA Research. : NH17-337/1993E-PDF

"The new 1995 National Building Code will call for larger and more effective fresh air intakes in residential buildings. Three types of problems could arise if unmixed cold air reached a furnace heat exchanger: 1) condensation; 2) metal stress; and, 3) cold air reaching a floor register. IRTA was contracted by the Research division of CMHC to evaluate the mixing of return air with outside air from a fresh air intake duct"--Executive summary.

Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.907473&sl=1

Renseignements sur la publication
Ministère/Organisme Canada Mortgage and Housing Corporation. Research Division, issuing body.
IRTA Research, issuing body.
Titre Testing of fresh air mixing devices / prepared for: Research Division, Canada Mortgage and Housing Corporation; prepared by: IRTA Research.
Type de publication Monographie
Langue [Anglais]
Format Électronique
Document électronique
Note(s) Digitized edition from print [produced by Canada Mortgage and Housing Corporation].
"CMHC Project Officer: Jim H. White."
Summary in English and French.
Information sur la publication Ottawa, Ontario : Research Division, Canada Mortgage and Housing Corporation, March 1993.
Description 1 online resource (21 pages) : illustrations
Numéro de catalogue
  • NH17-337/1993E-PDF
Descripteurs Furnaces -- Testing.
Air ducts -- Aerodynamics -- Testing.
Fours industriels -- Essais.
Conduits d'air -- Aérodynamique -- Essais.
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.
Date de modification :