000 01716cam  2200313zi 4500
0019.911344
003CaOODSP
00520221107182331
006m     o  d f      
007cr bn|||||||||
008220517e199203##bccb    ob   f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-bc
0861 |aEn84-296/1992E-PDF
1001 |aGodin, Benoît, |eauthor.
24510|aBaseline monitoring Dome Mountain Project - June 27, 1988 / |cby Benoit Godin and Michael Hagen.
264 1|a[Vancouver?] : |bEnvironment Canada, Conservation and Protection, Environmental Protection, Pacific and Yukon Region, |cMarch 1992.
300 |a1 online resource (ii, 12 pages) : |bmaps
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aDigitized edition from print [produced by Environment and Climate Change Canada].
504 |aIncludes bibliographical references (page 12).
520 |a"The Dome Mountain Project is located in the Guess Creek drainage basin about 35 kilometres east of Smithers. The gold mine project has underground workings on the east slope of Dome Mountain at the 1,400 metre level. Drainage is eastward via Federal Creek and Guess Creek. Guess Creek joins the Fulton River just upstream of Fulton Lake. Production started in 1991"--Introduction, page 1.
650 0|aWater quality|zBritish Columbia|xMeasurement.
650 6|aEau|xQualité|zColombie-Britannique|xMesure.
7101 |aCanada. |bConservation and Protection. |bPacific and Yukon Region, |eissuing body.
85640|qPDF|s441 KB|uhttps://publications.gc.ca/collections/collection_2022/eccc/En84-296-1992-eng.pdf