000 02651cam  2200409zi 4500
0019.916167
003CaOODSP
00520240110085216
006m     o  d f      
007cr cn|||||||||
008221013t20222022onca    o    f000 0 eng d
020 |a9780660458113
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-on
0861 |aT94-43/2022E-PDF
24500|aEvaluation of the Toronto Waterfront Revitalization Initiative’s PLFP Project : |bfinal report.
24613|aEvaluation of the Toronto Waterfront Revitalization Initiative's Port Lands Flood Protection Program
264 1|a[Ottawa] : |bInfrastructure Canada, |c2022.
264 4|c©2022
300 |a1 online resource (19 pages) : |billustrations + |e1 summary (2 unnumbered pages)
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aCover title.
500 |a"April 27 2022."
500 |aIssued also in French under title: Évaluation du projet de protection des terrains portuaires contre les inondations de l’Initiative de revitalisation du secteur riverain de Toronto : rapport final.
520 |a"The Toronto Waterfront Revitalization Initiative (TWRI) was created in 1999 when the Governments of Canada and Ontario, and the City of Toronto, announced a plan to rebuild and renew the districts of West Don Lands, East Bayfront, and the Port Lands. This led to the creation of a designated waterfront area in the City of Toronto. Waterfront Toronto (WT), a not-for-profit corporation with a Board of Directors appointed by the three levels of government, was established in 2001 with a 25-year mandate to lead the revitalization work"--Program overview, page 4.
650 0|aWaterfronts|zOntario|zToronto|xPlanning.
650 0|aCity planning|zOntario|zToronto.
651 0|aHarbourfront (Toronto, Ont.)
7101 |aCanada. |bInfrastructure Canada, |eissuing body.
77508|tÉvaluation du projet de protection des terrains portuaires contre les inondations de l’Initiative de revitalisation du secteur riverain de Toronto : |w(CaOODSP)9.916169
85640|qPDF|s1.91 MB|uhttps://publications.gc.ca/collections/collection_2023/infc/T94-43-2022-eng.pdf|zFinal report
85640|qPDF|s134 KB|uhttps://publications.gc.ca/collections/collection_2024/infc/T94-43-2022-1-eng.pdf|zSummary
8564 |qHTML|sN/A|uhttps://www.infrastructure.gc.ca/pd-dp/eval/eval-twri-plfp-irsrt-ptpi-eng.html|zFinal report
8564 |qHTML|sN/A|uhttps://www.infrastructure.gc.ca/pd-dp/eval/eval-twri-plfp-summary-resume-irsrt-ptpi-eng.html|zSummary