000 02348nam  2200349zi 4500
0019.932797
003CaOODSP
00520240201092600
006m     o  d f      
007cr mn|||||||||
008240123s2015    onca    ob   f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn---
045 |ay0y1
0861 |aT94-57/2015E-PDF
24500|aEvaluation of the Gas Tax Fund / |cInfrastructure Canada.
264 1|a[Ottawa] : |bInfrastructure Canada, |c2015.
300 |a1 online resource (44 pages) : |bcolour illustration
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aIssued also in French under title: Évaluation du Fonds de la taxe sur l'essence.
500 |a"DM Approval August 14, 2015."
504 |aIncludes bibliographical references (pages 34-35).
520 |a"The evaluation of the Gas Tax Fund (GTF) was conducted in accordance with the Treasury Board Secretariat Policy on Evaluation and its associated Directive and Standards. The evaluation was carried out between September 2014 and February 2015. Originally launched in 2005, the GTF provides predictable funding to municipalities to support environmentally sustainable infrastructure ($5 billion from 2005-06 to 2009-2010). In 2007, the program was extended until March 31, 2014 thereby providing municipalities with an additional $8 billion (2010-11 to 2013-14). The GTF program was designed to support environmentally sustainable municipal infrastructure that will contribute to the Government of Canada's environmental objectives of cleaner air, cleaner water and reduced greenhouse gas (GHG) emissions through six eligible project categories. The GTF also helps address infrastructure needs of First Nations"--Executive summary, page 5.
650 0|aInfrastructure (Economics)|zCanada|xFinance|xEvaluation.
650 0|aInfrastructure (Economics)|xGovernment policy|zCanada|xEvaluation.
7101 |aCanada. |bInfrastructure Canada, |eissuing body.
77508|tÉvaluation du Fonds de la taxe sur l'essence / |w(CaOODSP)9.933240
85640|qPDF|s644 KB|uhttps://publications.gc.ca/collections/collection_2024/infc/T94-57-2015-eng.pdf
8564 |qHTML|sN/A|uhttps://www.infrastructure.gc.ca/pd-dp/eval/2015-gtf-fte-eng.html