000 02747nam  2200445zi 4500
0019.933044
003CaOODSP
00520240215113432
006m     o  d f      
007cr |n|||||||||
008240129e198805uuabcabd  ob   f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-ab
0861 |aDR52-6/22-1988E-PDF
1001 |aHanna, D. M., |eauthor.
24510|aNATO reference mobility model evaluation of the Iltis 4x4 truck (u) / |cby D.M. Hanna and D.M. Patterson.
24636|aNATO reference mobility model evaluation of the Iltis 4x4 truck
264 1|aRalston, Alberta : |bDefence Research Establishment Suffield : |bNational Defence = Défense nationale, |cMay 1988
300 |a1 online resource (various pagings) : |billustrations, map, charts
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
4901 |aSuffield memorandum ; |vno. 1227
500 |a"ACN 0316X"--title page.
500 |aDigitized edition from print [produced by Defence Research and Development Canada].
504 |aIncludes bibliographical references (page 12).
5203 |a"The Directorate of Land Requirements (DLR), in an effort to assess the usefulness of the NATO Reference Mobility Model (NRMM) in vehicle procurement activities, initiated a study at the Defence Research Establishment Suffield with the following objectives: (1) to determine the difficulty and time required to provide all necessary NRMM input data for a typical wheeled vehicle; (2) to determine the time required to perform an NRMM evaluation; and (3) to establish a wheeled vehicle baseline. The vehicle chosen for this study was the Iltis 4x4 1/4 ton truck. All required vehicle characteristics were obtained within an acceptable time frame with the exception of the pitch-mass-moment of inertia of the sprung mass, which eventually was measured at an American laboratory. The NRMM simulation of the Iltis 4x4 required approximately one month to complete. [...]"--abstract.
650 0|aIltis truck.
650 0|aVehicles, Military|xSimulation methods.
650 0|aArmed Forces|xProcurement.
650 6|aIltis (Camion)
650 6|aVéhicules militaires|xMéthodes de simulation.
650 6|aForces armées|xApprovisionnement.
655 7|aTechnical reports|2lcgft
655 7|aRapports techniques|2rvmgf
7102 |aDefence Research Establishment Suffield, |eissuing body.
7101 |aCanada. |bDepartment of National Defence, |eissuing body.
830#0|aSuffield memorandum ;|vno. 1227.|w(CaOODSP)9.870467
85640|qPDF|s4.04 MB|uhttps://publications.gc.ca/collections/collection_2024/rddc-drdc/DR52-6-22-1988-eng.pdf