Existing building commissioning : recommissioning (RCx) of the Centre for Human and Animal Health Building (H-Block). : M154-167/2024E-PDF
"All systems in the H-Block are concerned. The new measures may take over a year to implement, however the delay will not exceed the two-year time limit. Some measures may require the help of a building automation system (BAS) technician, while other measures may only require the building operations staff"--Commissioning scope, page [1].
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.935195&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Existing building commissioning : recommissioning (RCx) of the Centre for Human and Animal Health Building (H-Block). |
| Type de publication | Monographie |
| Langue | [Anglais] |
| Autres langues publiées | [Français] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Description | 1 online resource (3 unnumbered pages) : illustrations, photographs |
| ISBN | 9780660707181 |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :