00000000nam 2200000zi 4500
0019.949154
003CaOODSP
00520250317150225
006m     o  d f      
007cr mn|||||||||
008250314e196807##abcabd  ob   f000 0 eng d
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn-ab
0861 |aA98-4/17-1968E-PDF
1001 |aTopham, H. L., |eauthor.
24510|aParlby Creek Project : |bpreliminary engineering report / |csubmitted by: H. L. Topham ; prepared by: W. F. Gibbs.
264 1|aCalgary, Alberta : |bCanada Department of Agriculture, Prairie Farm Rehabilitation Administration, Engineering Services, |cJuly, 1968.
300 |a1 online resource (34 pages, 11 figures) : |billustrations, maps, graphs
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aDigitized edition from print [provided by Agriculture and Agri-Food Canada].
504 |aIncludes bibliographical references (page 34).
520 |a"Following a request from the Province of Alberta, investigations were carried out to determine the feasibility and cost of constructing flood control and water supply works along Parlby Creek. The studies indicated that the frequent floods which now occur could be controlled by the construction of two storage reservoirs of 8,680 acre feet and 10,000 acre feet respectively, in conjunction with extensive channel improvement works downstream from the reservoirs"--Synopsis.
650 0|aFlood control|zAlberta.
650 0|aReservoirs|zAlberta|xDesign and construction.
650 0|aWater-supply|zAlberta.
650 6|aInondations|xMaîtrise|zAlberta.
650 6|aRéservoirs (Lacs)|zAlberta|xConception et construction.
650 6|aEau|xApprovisionnement|zAlberta.
7101 |aCanada. |bPrairie Farm Rehabilitation Administration. |bEngineering Service, |eissuing body.
85640|qPDF|s26.4 MB|uhttps://publications.gc.ca/collections/collection_2025/aac-aafc/a98/A98-4-17-1968-eng.pdf