South Saskatchewan River project : report on the investigation into the required spillway capacity / prepared by: C. Booy. : A98-4/54-1954E-PDF
"To judge the adequacy of the proposed spillway for the South Saskatchewan Dam, the required degree of safety against overtopping has been discussed and standards of design have been adopted accordingly. It was associated within the limits of accuracy set by the available hydrometric and meteorological data that the proposed design would meet these requirements"--Synopsis.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.950132&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | South Saskatchewan River project : report on the investigation into the required spillway capacity / prepared by: C. Booy. |
| Type de publication | Monographie |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (18 pages, 13 unnumbered pages) : maps, graphs |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :