Hydraulic modelling of the Peace-Athabasca delta under modified and natural flow conditions / prepared for the Northern River Basins Study under project 1151-B1 by B. Aitken and R. Sapach. : R71-49/3-43E-PDF
"The construction of the Bennett Dam in British Columbia, which was completed in 1967, altered the natural fluctuations of spring peaks and fall-winter low flows downstream on the Peace River in Alberta. The altered flow regimes had major implications for the ecosystem of the Peace- Athabasca Delta as water levels were increased in the winter and decreased in the summer"--Report summary.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.951119&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Hydraulic modelling of the Peace-Athabasca delta under modified and natural flow conditions / prepared for the Northern River Basins Study under project 1151-B1 by B. Aitken and R. Sapach. |
| Titre de la série |
|
| Type de publication | Monographie - Voir l'enregistrement principal |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Autres formats offerts | Texte matériel-[Anglais] |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (vi, 45 pages, 166 unnumbered pages) : photographs, maps, charts. |
| ISBN | 0662225597 |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :