Water resources use and management issues for the Peace, Athabasca and Slave River basins : stakeholder screening survey / prepared for the Northern River Basins Study under project 4121-D1 by Tony Hoare. : R71-49/3-57E-PDF
"Project 4121-D1, the Stakeholder Screening Survey was undertaken to build on the data collected in Project 4101-B1. Project 4101-B1 identified stakeholder groups that use or have an interest in the Peace, Athabasca and Slave River systems and recommended a workshop process for identifying the concerns of the stakeholder groups about water use in the three river systems. In Project 4121-D1, these organizations were surveyed to elicit sufficient information about the stakeholder groups to plan stakeholder workshops and to identify in a preliminary way the issues that should be addressed in the workshops. As well, through the survey process, a more complete stakeholder list was developed"--Report summary.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.951299&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Water resources use and management issues for the Peace, Athabasca and Slave River basins : stakeholder screening survey / prepared for the Northern River Basins Study under project 4121-D1 by Tony Hoare. |
| Variante du titre |
|
| Titre de la série |
|
| Type de publication | Monographie - Voir l'enregistrement principal |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Autres formats offerts | Texte matériel-[Anglais] |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (62 pages) : charts. |
| ISBN | 0662235606 |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :