00000000cam 2200000zi 4500
0019.951815
003CaOODSP
00520261005161525
006m     o  d f      
007cr cn|||||||||
008250603e202503##oncabdo ob   f000 0 eng d
020 |a9780660776347
040 |aCaOODSP|beng|erda|cCaOODSP
043 |an-cn---
0861 |aM164-18/2025E-PDF
24500|aGreen fleet best practices guide.
264 1|a[Ottawa] : |bNatural Resources Canada = Ressources naturelles Canada, |cMarch 2025.
264 4|c©2025
300 |a1 online resource (14-84 pages) : |billustrations, maps, graphs, photographs
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
500 |aCover title.
500 |aIssued also in French under title: Guide des meilleures pratiques pour des parcs de véhicules écologiques.
504 |aIncludes bibliographical references (pages 79-84).
520 |a"This guide is designed to provide an overview of best practices in fleet decarbonization and green fleet management. The following topics are included to help fleets navigate their transition to zero-emission vehicles: range anxiety, the impact of winter conditions on vehicle performance, total cost of ownership, funding and financing, infrastructure resilience, and charging system installations. This guide also addresses issues related to limited electrical capacity at fleet depots, limited space, fire risks, change management, evolving organizational roles and responsibilities, and cybersecurity concerns. Together, we have the power to fuel the energy transition and achieve Canada’s net-zero goals. Let’s take the first step towards a brighter, cleaner future"--Executive Summary and Introduction, Guide Objectives, page [10].
650 0|aSustainable transportation|zCanada.
650 0|aElectric vehicles|zCanada.
650 0|aBattery charging stations (Electric vehicles)|zCanada.
655 7|aHandbooks and manuals|2lcgft
7101 |aCanada. |bNatural Resources Canada, |eissuing body.
7102 |aCIMA+, |eissuing body.
77508|tGuide des meilleures pratiques pour des parcs de véhicules écologiques.|w(CaOODSP)9.951816
85640|qPDF|s9.56 MB|uhttps://publications.gc.ca/collections/collection_2026/rncan-nrcan/M164-18-2025-eng.pdf