Language selection

Search


Parlby Creek Project : preliminary engineering report / submitted by: H. L. Topham ; prepared by: W. F. Gibbs.A98-4/17-1968E-PDF

"Following a request from the Province of Alberta, investigations were carried out to determine the feasibility and cost of constructing flood control and water supply works along Parlby Creek. The studies indicated that the frequent floods which now occur could be controlled by the construction of two storage reservoirs of 8,680 acre feet and 10,000 acre feet respectively, in conjunction with extensive channel improvement works downstream from the reservoirs"--Synopsis.

Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.949154&sl=0

Publication information
Department/Agency
  • Canada. Prairie Farm Rehabilitation Administration. Engineering Service, issuing body.
TitleParlby Creek Project : preliminary engineering report / submitted by: H. L. Topham ; prepared by: W. F. Gibbs.
Publication typeMonograph
Language[English]
FormatDigital text
Electronic document
Note(s)
  • Digitized edition from print [provided by Agriculture and Agri-Food Canada].
  • Includes bibliographical references (page 34).
Publishing information
  • Calgary, Alberta : Canada Department of Agriculture, Prairie Farm Rehabilitation Administration, Engineering Services, July, 1968.
Author / Contributor
  • Topham, H. L., author.
Description1 online resource (34 pages, 11 figures) : illustrations, maps, graphs
Catalogue number
  • A98-4/17-1968E-PDF
Subject terms
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.

Page details