Parlby Creek Project : preliminary engineering report / submitted by: H. L. Topham ; prepared by: W. F. Gibbs. : A98-4/17-1968E-PDF
"Following a request from the Province of Alberta, investigations were carried out to determine the feasibility and cost of constructing flood control and water supply works along Parlby Creek. The studies indicated that the frequent floods which now occur could be controlled by the construction of two storage reservoirs of 8,680 acre feet and 10,000 acre feet respectively, in conjunction with extensive channel improvement works downstream from the reservoirs"--Synopsis.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.949154&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Parlby Creek Project : preliminary engineering report / submitted by: H. L. Topham ; prepared by: W. F. Gibbs. |
| Type de publication | Monographie |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (34 pages, 11 figures) : illustrations, maps, graphs |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :