South Saskatchewan River project design memorandum 13 : spillway : hydraulic model tests of chute divergence and stilling basin / [prepared by C.D. Smith].: A98-4/56-1960E-PDF
"This report gives details of the model study conducted on the spillway chute divergence and stilling basin for the South Saskatchewan River Dam. The purpose of the study was to establish hydraulic dimensions and design details for the downstream half of the spillway. Early investigation of this portion of the structure was required in order to allow earthwork contracts to be let, since this area included the deepest structure excavation on the project"--Synopsis, page 1.
Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.950134&sl=0
| Department/Agency |
|
|---|---|
| Title | South Saskatchewan River project design memorandum 13 : spillway : hydraulic model tests of chute divergence and stilling basin / [prepared by C.D. Smith]. |
| Publication type | Monograph |
| Language | [English] |
| Format | Digital text |
| Electronic document | |
| Note(s) |
|
| Publishing information |
|
| Author / Contributor |
|
| Description | 1 online resource (19 pages, 70 unnumbered pages) : illustrations, maps, graphs |
| Catalogue number |
|
| Subject terms |
|
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.Page details
- Date modified: