South Saskatchewan River project design memorandum 13 : spillway : hydraulic model tests of chute divergence and stilling basin / [prepared by C.D. Smith]. : A98-4/56-1960E-PDF
"This report gives details of the model study conducted on the spillway chute divergence and stilling basin for the South Saskatchewan River Dam. The purpose of the study was to establish hydraulic dimensions and design details for the downstream half of the spillway. Early investigation of this portion of the structure was required in order to allow earthwork contracts to be let, since this area included the deepest structure excavation on the project"--Synopsis, page 1.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.950134&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | South Saskatchewan River project design memorandum 13 : spillway : hydraulic model tests of chute divergence and stilling basin / [prepared by C.D. Smith]. |
| Type de publication | Monographie |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (19 pages, 70 unnumbered pages) : illustrations, maps, graphs |
| Numéro de catalogue |
|
| Descripteurs |
|
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :