IGCC Front End Engineering Design study / [Office of Energy Research and Development]. : M159-15/2013E-PDF
"Between 2006 and 2010, Capital Power Corporation (CPC), on behalf of the Canadian Clean Power Coalition, performed a Front End Engineering Design (FEED) study for an approximately 240-megawatt (MW) (net) integrated gasification combined cycle (IGCC) facility with carbon dioxide capture. This study was aimed at discovering the true cost and viability of such a facility, which would be built at the existing Genesee Generating Station in Alberta, Canada, approximately 50 kilometres west of Edmonton"--Project description.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.846609&sl=1
Ministère/Organisme | Canada. Natural Resources Canada. Canada. Office of Energy Research and Development. |
---|---|
Titre | IGCC Front End Engineering Design study / [Office of Energy Research and Development]. |
Type de publication | Monographie |
Langue | [Anglais] |
Autres langues publiées | [Français] |
Format | Électronique |
Document électronique | |
Note(s) | Issued also in French under title: Étude de l’ingénierie de base pour le cycle combiné à gazéification intégrée. Caption title. "Revised March 2013." |
Information sur la publication | [Ottawa : Office of Energy Research and Development], 2013. |
Description | [1] p. |
Numéro de catalogue |
|
Descripteurs | Electric power stations Greenhouse gases Carbon dioxide capture |
Demander des formats alternatifs