IGCC Front End Engineering Design study / [Office of Energy Research and Development]. : M159-15/2013E-PDF
"Between 2006 and 2010, Capital Power Corporation (CPC), on behalf of the Canadian Clean Power Coalition, performed a Front End Engineering Design (FEED) study for an approximately 240-megawatt (MW) (net) integrated gasification combined cycle (IGCC) facility with carbon dioxide capture. This study was aimed at discovering the true cost and viability of such a facility, which would be built at the existing Genesee Generating Station in Alberta, Canada, approximately 50 kilometres west of Edmonton"--Project description.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.846609&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | IGCC Front End Engineering Design study / [Office of Energy Research and Development]. |
| Type de publication | Monographie |
| Langue | [Anglais] |
| Autres langues publiées | [Français] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Description | [1] p. |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :