IGCC Front End Engineering Design study / [Office of Energy Research and Development]. : M159-15/2013E-PDF

"Between 2006 and 2010, Capital Power Corporation (CPC), on behalf of the Canadian Clean Power Coalition, performed a Front End Engineering Design (FEED) study for an approximately 240-megawatt (MW) (net) integrated gasification combined cycle (IGCC) facility with carbon dioxide capture. This study was aimed at discovering the true cost and viability of such a facility, which would be built at the existing Genesee Generating Station in Alberta, Canada, approximately 50 kilometres west of Edmonton"--Project description.

Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.846609&sl=1

Renseignements sur la publication
Ministère/Organisme Canada. Natural Resources Canada.
Canada. Office of Energy Research and Development.
Titre IGCC Front End Engineering Design study / [Office of Energy Research and Development].
Type de publication Monographie
Langue [Anglais]
Autres langues publiées [Français]
Format Électronique
Document électronique
Note(s) Issued also in French under title: Étude de l’ingénierie de base pour le cycle combiné à gazéification intégrée.
Caption title.
"Revised March 2013."
Information sur la publication [Ottawa : Office of Energy Research and Development], 2013.
Description [1] p.
Numéro de catalogue
  • M159-15/2013E-PDF
Descripteurs Electric power stations
Greenhouse gases
Carbon dioxide capture