IGCC Front End Engineering Design study / [Office of Energy Research and Development].: M159-15/2013E-PDF

"Between 2006 and 2010, Capital Power Corporation (CPC), on behalf of the Canadian Clean Power Coalition, performed a Front End Engineering Design (FEED) study for an approximately 240-megawatt (MW) (net) integrated gasification combined cycle (IGCC) facility with carbon dioxide capture. This study was aimed at discovering the true cost and viability of such a facility, which would be built at the existing Genesee Generating Station in Alberta, Canada, approximately 50 kilometres west of Edmonton"--Project description.

Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.846609&sl=0

Publication information
Department/Agency Canada. Natural Resources Canada.
Canada. Office of Energy Research and Development.
Title IGCC Front End Engineering Design study / [Office of Energy Research and Development].
Publication type Monograph
Language [English]
Other language editions [French]
Format Electronic
Electronic document
Note(s) Issued also in French under title: Étude de l’ingénierie de base pour le cycle combiné à gazéification intégrée.
Caption title.
"Revised March 2013."
Publishing information [Ottawa : Office of Energy Research and Development], 2013.
Description [1] p.
Catalogue number
  • M159-15/2013E-PDF
Subject terms Electric power stations
Greenhouse gases
Carbon dioxide capture
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.
Date modified: