IGCC Front End Engineering Design study / [Office of Energy Research and Development].: M159-15/2013E-PDF
"Between 2006 and 2010, Capital Power Corporation (CPC), on behalf of the Canadian Clean Power Coalition, performed a Front End Engineering Design (FEED) study for an approximately 240-megawatt (MW) (net) integrated gasification combined cycle (IGCC) facility with carbon dioxide capture. This study was aimed at discovering the true cost and viability of such a facility, which would be built at the existing Genesee Generating Station in Alberta, Canada, approximately 50 kilometres west of Edmonton"--Project description.
Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.846609&sl=0
| Department/Agency |
|
|---|---|
| Title | IGCC Front End Engineering Design study / [Office of Energy Research and Development]. |
| Publication type | Monograph |
| Language | [English] |
| Other language editions | [French] |
| Format | Digital text |
| Electronic document | |
| Note(s) |
|
| Publishing information |
|
| Description | [1] p. |
| Catalogue number |
|
| Subject terms |
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.Page details
- Date modified: