Sélection de la langue

Recherche


Nearshore bedload and suspended sediment transport in the vicinity of the Pickering Nuclear Generation Station, Lake Ontario / J.P. Coakley and N.A. Rukavina. : En13-5/89-17E-PDF

"This report was prepared at the request of the Geotechnical and Hydraulic Engineering Department of Ontario Hydro to assist Hydro in decisions regarding developments to its cooling water intake system, including possible re-location"--Management perspective.

Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.873330&sl=1

Renseignements sur la publication
Ministère/Organisme
  • Canada. Environment Canada.
  • National Water Research Institute (Canada). Lakes Research Branch.
  • Canada Centre for Inland Waters.
TitreNearshore bedload and suspended sediment transport in the vicinity of the Pickering Nuclear Generation Station, Lake Ontario / J.P. Coakley and N.A. Rukavina.
Titre de la série
  • NWRI contribution ; no. 89-17
Type de publicationMonographie - Voir l'enregistrement principal
Langue[Anglais]
FormatTexte numérique
Document électronique
Note(s)
  • Digitized edition from print [produced by Environment and Climate Change Canada].
  • Includes bibliographical references (page 17).
  • Includes management perspective and abstract in French.
Information sur la publication
  • Burlington, Ontario : Lakes Research Branch, National Water Research Institute, Canada Centre for Inland Waters, May 1989.
Auteur / Contributeur
  • Coakley, J. P. author.(John Phillip), 1940-
  • Rukavina, N. A., author.
Description1 online resource (17, [49] pages) : illustrations.
Numéro de catalogue
  • En13-5/89-17E-PDF
Descripteurs
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.

Détails de la page

Date de modification :