Nearshore bedload and suspended sediment transport in the vicinity of the Pickering Nuclear Generation Station, Lake Ontario / J.P. Coakley and N.A. Rukavina.: En13-5/89-17E-PDF
"This report was prepared at the request of the Geotechnical and Hydraulic Engineering Department of Ontario Hydro to assist Hydro in decisions regarding developments to its cooling water intake system, including possible re-location"--Management perspective.
Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.873330&sl=0
Department/Agency | Canada. Environment Canada. National Water Research Institute (Canada). Lakes Research Branch. Canada Centre for Inland Waters. |
---|---|
Title | Nearshore bedload and suspended sediment transport in the vicinity of the Pickering Nuclear Generation Station, Lake Ontario / J.P. Coakley and N.A. Rukavina. |
Series title | NWRI contribution ; no. 89-17 |
Publication type | Series - View Master Record |
Language | [English] |
Format | Electronic |
Electronic document | |
Note(s) | Digitized edition from print [produced by Environment and Climate Change Canada]. Includes bibliographical references (page 17). Includes management perspective and abstract in French. |
Publishing information | Burlington, Ontario : Lakes Research Branch, National Water Research Institute, Canada Centre for Inland Waters, May 1989. |
Author / Contributor | Coakley, J. P. author.(John Phillip), 1940- Rukavina, N. A., author. |
Description | 1 online resource (17, [49] pages) : illustrations. |
Catalogue number |
|
Subject terms | Sediments Water management |
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.- Date modified: