Athabasca River project, 1989/90 progress report / edited by : B.G. Brownlee. : En13-5/90-76E-PDF

"Two sampling trips were carried out on the lower Athabasca River, Peace River and Slave River as the first phase of a reconnaissance survey to study polycyclic aromatic hydrocarbons (PAHs) downstream of the Suncor and Syncrude oil sands extraction plants on the Athabasca River north of Fort McMurray, Alberta, and to determine the impact of these operations relative to natural sources and upstream industrial activity"--Abstract.

Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.876877&sl=1

Renseignements sur la publication
Ministère/Organisme Canada. Environment Canada.
Canada Centre for Inland Waters.
National Water Research Institute (Canada). Rivers Research Branch.
Titre Athabasca River project, 1989/90 progress report / edited by : B.G. Brownlee.
Titre de la série NWRI contribution ; 90-76
Type de publication Série - Voir l'enregistrement principal
Langue [Anglais]
Format Électronique
Document électronique
Note(s) "RRB 90-44."
Title from cover.
Digitized edition from print [produced by Environment and Climate Change Canada].
Includes bibliographical references (pages 8-11).
Includes abstract and management perspective in English and French.
Information sur la publication Burlington, Ontario : Canada Centre for Inland Waters, National Water Research Institute, Rivers Research Branch, May 1990.
Auteur / Contributeur Brownlee, B. G., editor.
Description 1 online resource (11 pages, 12 unnumbered pages) : maps, graphs.
Numéro de catalogue
  • En13-5/90-76E-PDF
Descripteurs Rivers
Oil sands
Surveying
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.
Date de modification :