Liard River Basin spring flood : progress report / B.J. Grey, D.A. Sherstone ; prepared by Snow & Ice Division, N.H.R.I., Inland Waters Directorate, Environmental Management Service, Environment Canada. : En37-448/1980E-PDF
"Aerial reconnaissance and ground monitoring were used to determine the characteristics, pattern and timing of river ice break-up on the Liard River. Ice jams and their associated effects were studied, and channel morphometry was investigated at two ice jam-prone sites. A limited program to measure pre-break-up ice thickness was initiated. Ice thickness was variable across the channel, and decreased rapidly immediately before break-up. Discharge increase was the major factor in initiating and sustaining break-up"--Synopsis.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.898843&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Liard River Basin spring flood : progress report / B.J. Grey, D.A. Sherstone ; prepared by Snow & Ice Division, N.H.R.I., Inland Waters Directorate, Environmental Management Service, Environment Canada. |
| Type de publication | Monographie |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (1 volume (various pagings)) : maps, graphs, photographs |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :