Construction of Goodyear floating tire breakwater at La Salle marina, Burlington, Ontario / by Craig T. Bishop and Basil A. Gallant. : En36-540/09-1981E-PDF
"The construction and installation of a Goodyear-type floating tire breakwater at La Salle Marina, Burlington, Ontario is documented. A total breakwater length of about 490 m made from 35,000 tires was installed, making it one of the world's largest Goodyear FTB installations. All work was done by a construction firm using professional labour. Topics discussed include the selection and acquisition of construction materials, the choice of construction site assembly techniques, mooring the breakwater, problems encountered, and costs"--Abstract.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.903232&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Construction of Goodyear floating tire breakwater at La Salle marina, Burlington, Ontario / by Craig T. Bishop and Basil A. Gallant. |
| Titre de la série |
|
| Type de publication | Monographie - Voir l'enregistrement principal |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (18 pages) : illustrations. |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs