Sélection de la langue

Recherche


Cost estimation using three point estimates / by E.J. Emond. : D68-15/7-1985E-PDF

"This report describes a method of summing cost estimates to produce a probability distribution for the total cost. The method is well suited for practical use because the calculations are all done by computer and the analyst's input has been reduced to three easily understood estimates for each cost element ... The method is based on the assumption that the uncertainty in a cost element can be adequately described by a triangular distribution"--Introduction, page 2.

Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.941635&sl=1

Renseignements sur la publication
Ministère/Organisme
  • Canada. Department of National Defence. Directorate of Mathematics and Statistics, issuing body.
  • Canada.‏ Department of National Defence. Operational Research and Analysis Establishment, issuing body.
TitreCost estimation using three point estimates / by E.J. Emond.
Titre de la série
  • [ORAE] project report ; PR 303
Type de publicationMonographie - Voir l'enregistrement principal
Langue[Anglais]
FormatTexte numérique
Document électronique
Note(s)
  • Digitized edition from print [produced by Defence Research and Development Canada].
  • Includes bibliographical references [page 23].
Information sur la publication
  • Ottawa, Canada : Department of National Defence, Operational Research and Analysis Establishment, Directorate of Mathematics and Statistics, May 1985.
Auteur / Contributeur
  • Emond, E. J., author.
Description1 online resource (17, A-2 pages) : illustrations, graphs.
Numéro de catalogue
  • D68-15/7-1985E-PDF
Descripteurs
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.

Détails de la page

Date de modification :