Sélection de la langue

Recherche


Construction report on revisions and improvements to Parr-Castor project S.W.¼ 2-38-14-W4 / submitted by: W. D. Gray; prepared by: Alberta Regional Office. : A98-4/14-1962E-PDF

"The Parr-Castor dam and spillway were originally built at the request of the Rural Municipality (R.M.) of Paintearth as a stock watering project in 1950, the R.M. supplying the required right of way. The Town of Castor has tapped the reservoir for a domestic water supply. In March, 1952, the Town of Castor signed an agreement with Canada whereby the Town took over the control, management and operation of the dam and reservoir"--Page 1.

Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.949151&sl=1

Renseignements sur la publication
Ministère/Organisme
  • Canada. Prairie Farm Rehabilitation Administration. Engineering Branch, issuing body.
TitreConstruction report on revisions and improvements to Parr-Castor project S.W.¼ 2-38-14-W4 / submitted by: W. D. Gray; prepared by: Alberta Regional Office.
Type de publicationMonographie
Langue[Anglais]
FormatTexte numérique
Document électronique
Note(s)
  • Digitized edition from print [provided by Agriculture and Agri-Food Canada].
Information sur la publication
  • Calgary, Alberta : Canada Department of Agriculture, Prairie Farm Rehabilitation Administration, Engineering Branch, August, 1962.
Auteur / Contributeur
  • Gray, W. D., author.
Description1 online resource (38 pages) : illustrations, maps, graphs, photographs
Numéro de catalogue
  • A98-4/14-1962E-PDF
Descripteurs
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.

Détails de la page

Date de modification :