Construction report on revisions and improvements to Parr-Castor project S.W.¼ 2-38-14-W4 / submitted by: W. D. Gray; prepared by: Alberta Regional Office. : A98-4/14-1962E-PDF
"The Parr-Castor dam and spillway were originally built at the request of the Rural Municipality (R.M.) of Paintearth as a stock watering project in 1950, the R.M. supplying the required right of way. The Town of Castor has tapped the reservoir for a domestic water supply. In March, 1952, the Town of Castor signed an agreement with Canada whereby the Town took over the control, management and operation of the dam and reservoir"--Page 1.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.949151&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Construction report on revisions and improvements to Parr-Castor project S.W.¼ 2-38-14-W4 / submitted by: W. D. Gray; prepared by: Alberta Regional Office. |
| Type de publication | Monographie |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (38 pages) : illustrations, maps, graphs, photographs |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :