Report : Morden dam spillway repairs / submitted by: H. G. Riesen ; prepared by: D. J. Berry. : A98-4/32-1958E-PDF
"This report contains an account of the investigation, study, and repairs undertaken on the Morden Dam Spillway in the summer and fall of 1957. This work was necessary because of the damage caused to the slab through built-up water pressure resulting from a plugged drainage system. The total cost of these repairs was $28,000"--Synopsis.
Lien permanent pour cette publication :
publications.gc.ca/pub?id=9.950098&sl=1
| Ministère/Organisme |
|
|---|---|
| Titre | Report : Morden dam spillway repairs / submitted by: H. G. Riesen ; prepared by: D. J. Berry. |
| Type de publication | Monographie |
| Langue | [Anglais] |
| Format | Texte numérique |
| Document électronique | |
| Note(s) |
|
| Information sur la publication |
|
| Auteur / Contributeur |
|
| Description | 1 online resource (41 pages, 37 unnumbered pages) : illustrations, graphs, photographs |
| Numéro de catalogue |
|
| Descripteurs |
Demander des formats alternatifs
Pour demander une publication dans un format alternatif, remplissez le formulaire électronique des publications du gouvernement du Canada. Utilisez le champ du formulaire «question ou commentaire» pour spécifier la publication demandée.Détails de la page
- Date de modification :