Report : Morden dam spillway repairs / submitted by: H. G. Riesen ; prepared by: D. J. Berry.: A98-4/32-1958E-PDF
"This report contains an account of the investigation, study, and repairs undertaken on the Morden Dam Spillway in the summer and fall of 1957. This work was necessary because of the damage caused to the slab through built-up water pressure resulting from a plugged drainage system. The total cost of these repairs was $28,000"--Synopsis.
Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.950098&sl=0
| Department/Agency |
|
|---|---|
| Title | Report : Morden dam spillway repairs / submitted by: H. G. Riesen ; prepared by: D. J. Berry. |
| Publication type | Monograph |
| Language | [English] |
| Format | Digital text |
| Electronic document | |
| Note(s) |
|
| Publishing information |
|
| Author / Contributor |
|
| Description | 1 online resource (41 pages, 37 unnumbered pages) : illustrations, graphs, photographs |
| Catalogue number |
|
| Subject terms |
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.Page details
- Date modified: