Language selection

Search


Report : Morden dam spillway repairs / submitted by: H. G. Riesen ; prepared by: D. J. Berry.A98-4/32-1958E-PDF

"This report contains an account of the investigation, study, and repairs undertaken on the Morden Dam Spillway in the summer and fall of 1957. This work was necessary because of the damage caused to the slab through built-up water pressure resulting from a plugged drainage system. The total cost of these repairs was $28,000"--Synopsis.

Permanent link to this Catalogue record:
publications.gc.ca/pub?id=9.950098&sl=0

Publication information
Department/Agency
  • Canada. Prairie Farm Rehabilitation Administration. Engineering Branch, issuing body.
TitleReport : Morden dam spillway repairs / submitted by: H. G. Riesen ; prepared by: D. J. Berry.
Publication typeMonograph
Language[English]
FormatDigital text
Electronic document
Note(s)
  • Digitized edition from print [provided by Agriculture and Agri-Food Canada].
Publishing information
  • Winnipeg, Manitoba : Prairie Farm Rehabilitation Administration, Engineering Branch, February, 1958.
Author / Contributor
  • Berry, D. J., author.
Description1 online resource (41 pages, 37 unnumbered pages) : illustrations, graphs, photographs
Catalogue number
  • A98-4/32-1958E-PDF
Subject terms
Request alternate formats
To request an alternate format of a publication, complete the Government of Canada Publications email form. Use the form’s “question or comment” field to specify the requested publication.

Page details